Roadway Redevelopment Project
The construction for Phase 1 of the project started on Monday, June 28, 2021.
Phase 1 of the project is located along the frontage of the Indian Creek Country Club and between Lots 14 and 15.
This work will include the excavation of the entire existing roadway, the replacement of the drainage system, the installation of sewer utility lines and the rebuilding of a roadway bed with a drivable surface. Each phase of the project
will include the same scope of work.
The final stage of the project will be the landscaping, pathway trail, street lighting and application of the last top layer of the road.
Phase 1 will be completed by October 1, 2021.
Project's Construction Phasing Map
Final Roadway Project Plans
Perimeter Security System
The installation of the Perimeter Security poles and camera/radar equipment began on Monday, June 14th, 2021.
This newly installed integrated security system will quickly identify water borne activities and alert Village Public Safety officials by transmitting the live thermal video coverage.
The foundation of the system will integrate all underlying existing security systems (solarbeam & video) for the fastest detection of threats or incidents enabling the most efficient emergency response.